Siemens PLC programming.
TIA Portal, S7-1500 and WinCC Unified.
DAXP Automation programs Siemens S7-1200 and S7-1500 PLCs in TIA Portal: machine logic, WinCC screens, PROFINET communications and F-CPU safety logic. We prepare the program offline, test it in simulation and stay on site until it works.
What we do with Siemens
From function block to a running cabinet.
Structured, readable and documented programs, written so the maintenance team can understand them the day they need to change something.
Let's talk about your projectCapabilities
S7-1200 and S7-1500 PLCs
Programming in LAD, FBD, SCL and GRAPH according to IEC 61131-3. Reusable blocks (FB, UDT), project libraries and consistent naming.
F-CPU safety
Safety logic on S7-1500F and ET 200SP F with PROFIsafe: emergency stops, light curtains, doors and muting, programmed to the project’s safety specification.
WinCC HMI and SCADA
WinCC Unified and Comfort screens: clear navigation, alarms that help the operator, recipes and trends.
Communications
PROFINET and PROFIBUS, OPC UA on the S7-1500, Modbus TCP and signal exchange with Fanuc, ABB or KUKA robots.
Drives
SINAMICS drives over PROFINET with PROFIdrive telegrams and technology objects.
Simulation
Program testing with PLCSIM and PLCSIM Advanced and, where the project allows, Virtual Commissioning before start-up.
Diagnostics for maintenance
Diagnostic buffer, ProDiag and system messages brought to the HMI, so maintenance knows what failed and where without plugging in a laptop.
Libraries and versions
TIA Portal type libraries to version blocks and roll out a fix in a controlled way to every machine that shares the same code.
We work with our own programming standard or with the customer's: a block structure per unit, mode handling (automatic, manual and step), clear fault texts and an alarm list that stays consistent between PLC and HMI.
The goal is not just a machine that works on commissioning day, but one that is still easy to maintain and extend years later, even when the person touching it is not the one who wrote it.
S7-300 and S7-400 to S7-1500 migration
The S7-300 range is being phased out: plan the move before a module fails with no spare available.
A good migration is not just converting the program. It means reviewing what the tool does not convert cleanly and switching over on site with a rollback plan.
Let's talk about your projectHow we do it
- 01Inventory
Existing hardware, firmware versions, program, network and HMI. Verified backup before touching anything.
- 02Conversion and review
STEP 7 project migrated to TIA Portal, with manual review of absolute addressing, system blocks, timers and communications.
- 03Offline testing
Critical sequences validated in simulation before the shutdown.
- 04On-site switchover
Replacement during the agreed shutdown window, with a rollback plan if anything does not behave as expected.
- 05Documentation
Commented program, change list and final backup handed over to maintenance.
Siemens has announced the end of the S7-300 product lifecycle and recommends moving to S7-1500. Over time, spare CPUs and modules will become harder and more expensive to find. Planning the migration lets you choose the shutdown date instead of letting a breakdown choose it.
Replacing the whole cabinet is not always necessary. Depending on the case, the CPU can be replaced and the existing ET 200M I/O connected over PROFINET by changing its interface module, or the full assembly can be renewed. We decide with the customer after the inventory, with the cost and risk of each option on the table.
Typical Siemens projects
Illustrative examples of the kind of project we work on. They are not customer references.
Robot cell with a master PLC
S7-1500 as cell master, robot over PROFINET, WinCC Unified HMI and safety fencing handled by an F-CPU.
Packaging line
S7-1200 with SINAMICS G120 drives over PROFINET, format recipes and batch logging.
Upgrading an existing machine
S7-300 to S7-1500 migration keeping the field I/O and renewing the HMI.
Frequently asked questions
Do you work with TIA Portal or also with classic STEP 7?
Both. New projects are developed in TIA Portal. On S7-300 or S7-400 installations programmed in STEP 7 V5.x we work on the existing program, or migrate it to TIA Portal when the project justifies it.
Can you modify a Siemens program you did not write?
Yes, it is a normal part of the job. We take a backup and understand the program first, then apply the changes and document them.
Do you program the machine’s safety logic?
We program F-CPU safety logic with PROFIsafe to the project’s safety specification. The risk assessment and the required performance level are determined by the machine owner or their safety engineering team.
Do you need to be on site to program?
Not for most of the development. We program offline and test in simulation; time on site is focused on commissioning and final tuning.
Where do you work?
From Vigo, across Galicia and the rest of Spain. For projects outside Spain, tell us about the case.
Which TIA Portal version do you use?
The one installed at the customer's site or the one required by the project standard, so maintenance can open the program without upgrading anything. If an upgrade makes sense, we propose it first and carry it out in a controlled way.
How long does an S7-300 to S7-1500 migration take?
It depends on the size of the program, the I/O and whether the HMI is also renewed. What shortens the shutdown most is the work done beforehand: conversion, review and testing in simulation. That keeps the on-site intervention within the agreed window.
What is PLCSIM Advanced used for?
It is the Siemens simulator that runs a virtual S7-1500 with network communication. It lets you test the program against the HMI, other PLCs or a model of the machine (virtual commissioning) before the hardware is on site.
Do you integrate robots with a Siemens PLC?
Yes. Fanuc, ABB and KUKA robots over PROFINET with a signal table defined from the start and, where the robot supports it, safety signal exchange over PROFIsafe.
Got a Siemens project?
Tell us which machine or line it is, where it stands and what you need.