Industry · Automotive

Automotive automation.
Robot cells, lines and traceability.

In automotive, a stopped line is measured in minutes and penalties. DAXP Automation programs and integrates robot cells, assembly lines and traceability systems for Tier 1 and Tier 2 suppliers, from Vigo, the main automotive hub in Galicia.

01 · THE CHALLENGE

What an automotive line demands

Tight cycle times, the OEM’s standards and zero improvisation.

Working for the automotive supply chain means meeting the standard you are given and arriving at commissioning with the work already done.

Let's talk about your line

Common challenges

  • 01
    Tight cycle time

    Sequences optimised to the second, with no needless waits between robot and PLC.

  • 02
    Customer standards

    Program structure, HMI and naming according to the customer’s or OEM’s automation standard, applied from day one.

  • 03
    Part-level traceability

    Logging by serial number, inspection results and process parameters, as the supply chain requires.

  • 04
    Short commissioning windows

    Weekends and planned shutdowns: you have to arrive with a program already tested in simulation.

  • 05
    Model changes

    Recipes and variants handled from the HMI, without reprogramming.

  • 06
    Machine safety

    Guarding, light curtains and robot and PLC safety functions integrated on the basis of the project safety specification.

  • 07
    Handover documentation

    Commented programs, signal lists and backups delivered according to the customer standard.

Vigo is one of the main automotive hubs in Spain, with a supply chain that works to very short launch schedules. Arriving at commissioning with the program already tested in simulation is what makes it possible to start up within the planned window.

02 · WHAT WE DO

What we automate in automotive

From the welding robot to the end-of-line inspection station.

Let's talk about your line

Applications

  • Robotic assembly cells
  • MIG/MAG and spot welding
  • Part handling and transfer
  • Machine vision
  • Poka-yoke systems
  • Robot–PLC integration
  • CNC machine integration
  • Traceability and MES connection
  • Line commissioning and tuning

Technologies

We work as a direct integrator or as technical reinforcement for engineering firms that already own the project: offline robot and PLC programming, commissioning and support during the first production shifts.

Application examples

Typical automotive projects

Illustrative examples of the kind of project we work on. They are not customer references.

Robotic MIG welding cell

Fanuc robot and Siemens S7-1500 PLC with 2D vision. Serial-number traceability integrated with the MES.

Modular assembly line

Rockwell ControlLogix and robot stations, model recipes and poka-yoke validation.

Vision-based quality station

Robot-mounted camera inspection, PROFINET exchange with the PLC and automatic reject.

FAQ

Frequently asked questions

Do you work to the OEM’s automation standard?

Yes. In automotive the OEM or Tier 1 usually imposes its programming, HMI and naming standard; we apply it from the start of development.

Can you reinforce our team during commissioning?

Yes. We work with engineering firms and integrators as technical reinforcement for offline programming, commissioning or after-sales support, within their project and to their standards.

Which robot brands do you integrate?

Fanuc, ABB, KUKA and Universal Robots, with a Siemens or Rockwell PLC as cell master.

Where do you work?

From Vigo, across Galicia and the rest of Spain. For projects outside Spain, tell us about the case.

How does your work fit with IATF 16949?

IATF 16949 certifies the supplier's quality system, not the integrator. What we provide is what that system needs from the line: part-level traceability, process parameter logging, poka-yoke systems and documentation of every change.

What is a poka-yoke system?

A mechanism that prevents an error or detects it on the spot: sensors that check the right part is in the right position, vision that verifies an assembly, or interlocks that stop the sequence if an operation is missing.

Can you program the cell before it arrives on site?

Yes. With the layout and the robot model we program and simulate in ROBOGUIDE, RobotStudio or KUKA.Sim, and test the PLC with PLCSIM or Logix Emulate. On site, points and timings are fine-tuned on a program that has already been tested.

Do you connect the line to the MES?

Yes, through OPC UA, a database or the interface defined by the MES, to send results by serial number and receive orders or recipes.

Next step

Got a line or cell in progress?

Tell us about the project, the deadline and the standard you work to.